Replaced the concrete sewer pipe up to the edge of the road, securing the connection with a Fernco fitting and reinforcing it with concrete. Tied into the existing PVC line using a coupling, ensuring all new piping is Schedule 40 for durability. The entire system was bedded, tested, and confirmed to be leak-free.