Client had drainage issues. We cleared the main line through the 3” cleanout and confirmed flow is restored. A secondary cleanout behind the downstairs lavatory had limited access due to blockage or corrosion, but we cleared what we could and verified flow. System should hold until the full lateral replacement is done.