The client reported issues with their existing hose bib setup. Our technician abandoned the old hose bib and installed a new wall penetration that supplies both hose bibs. The new water lines were insulated to protect against winter conditions, and a shutoff valve was added before the wall penetration for easy seasonal shutoff. All work was completed and tested to ensure proper operation.