Removed all exposed existing pipes and replaced them with Schedule 40 PVC for improved durability and performance. All upstairs fixture drains were replaced, properly strapped for stability, and thoroughly tested for leaks. The updated drain system is now ready to be drywalled over, ensuring long-term functionality and reliability.