Removed all exposed existing piping using professional-grade cutting and extraction methods. Replaced the old piping with high-quality Schedule 40 PVC to improve durability and overall system reliability. All new piping was properly supported and strapped to ensure secure installation and long-term performance. The system was tested and confirmed to be functioning as intended.