Tied the lateral into the tap and capped it inside the crawlspace. Connected the water service to the meter and capped it inside the crawlspace as well. Both connections were inspected and passed, confirming proper installation.
Tied the lateral into the tap and capped it inside the crawlspace. Connected the water service to the meter and capped it inside the crawlspace as well. Both connections were inspected and passed, confirming proper installation.